BART expects to have full service between San Francisco and the East Bay through the Transbay Tube restored by 4 p.m.

1:47 p.m.: BART sent out a tweet saying full transbay service will be restored by 4 p.m.

1 p.m.: BART officials say they expect trains to be single tracking (trains running in both directions but sharing a single track) throught the Transbay Tube by 4 .m.

2:15 a.m.: A fire broke out at a construction site adjacent to the West Oakland station. The fire damaged porcelain insulators and other electrical equipment and BART was forced to halt service in the transbay Tube.

Read the full story about the fire and BART disruption.

Alternate Transportation Options:

Copyright © 2024 KGO-TV. All Rights Reserved.