Big rig crash cleared from EB lanes of Dumbarton Bridge

Tuesday, April 16, 2019
NEWARK, Calif. (KGO) -- A jack-knifed big rig has been cleared from eastbound lanes of the Dumbarton Bridge.

There are residual delays past the bridge.

Highway 237 or the San Mateo Bridge can be used as alternates.
[Ads /]
Check traffic maps and drive times here.

Stay with ABC7 News for more on this developing story.
[Ads /]


Copyright © 2024 KGO-TV. All Rights Reserved.