Richmond-San Rafael Bridge to undergo more retrofitting

Friday, February 22, 2019
SAN RAFAEL, Calif. (KGO) -- Caltrans announced work will continue on the Richmond-San Rafael Bridge after replacing a failed expansion joint on the upper deck.

RELATED: Man survives falling concrete striking his car on Richmond-San Rafael Bridge
[Ads /]
The work on the failed joint that dropped concrete on a driver, shutting down the bridge for hours, will finish March 3.

Contractors will stay on-site for the next several months to replace an additional 31 joints on the upper deck.

RELATED: Drivers stuck after lanes closed for second time on Richmond-San Rafael bridge due to falling concrete
[Ads /]
The work will follow the same schedule, taking place overnight from 9 p.m. to 5 a.m. and bringing traffic on the upper deck down to one lane.

There will also be 30 joints on the lower deck replaced later this year as a part of a previously scheduled maintenance.


See more stories, videos, and images related to the Richmond-San Rafael Bridge construction.
Copyright © 2024 KGO-TV. All Rights Reserved.