Renderings of the 2.8 million square foot campus show the central building which resembles a ring with circular hallways.
A 90,000 square foot cafeteria spills out into parkland.
Future product launches will take place in an underground auditorium beneath a glass pavilion.
The project is estimated at $5 billion.