PG&E says it has inspected the pipeline that runs between Brittan Avenue and El Camino Real and determined it to be problem free.
The pipeline is part of a segment that connects two main transmission lines up the peninsula to San Francisco. It was on the list of 100 high priority projects released following the Sept. 9 San Bruno gas explosion and fire.